Termination Log: Site-96 Incident Report
The following log details the termination procedures undertaken at Site-96 on date. The primary objective of the operation was to neutralize a subject classified as Keter designation. Initial reports indicate that the termination protocol was successful with minimal collateral damage. Subject containment breach occurred at approximately cycle delta