Termination Log: Site-96 Incident Report
Termination Log: Site-96 Incident Report
Blog Article
The following log details the termination procedures undertaken at Site-96 on date. The primary objective of the operation was to neutralize a subject classified as Keter designation. Initial reports indicate that the termination protocol was successful with minimal collateral damage. Subject containment breach occurred at approximately cycle delta 18. Further investigation into the incident's origin is ongoing.
- Personnel involved in termination: Dr.Last Name Redacted, Dr.Last Name Redacted, AgentID number Redacted.
- Weapons and equipment deployed:: M-Class weaponry, dimensional anchor.
Full report pending security clearance level 5 access.
Euclid Containment Breach - Site 96
On 08/15/XXXX| During midday, an anomaly occurred at Site 96, resulting in the breach of Euclid-class entity SCP-ZZZ. Initial reports indicate system malfunction as the primary cause. Security personnel were immediately dispatched to the affected area and engaged in a hostile confrontation.
- The breached entity exhibited altered behavior patterns, posing a potential threat to surrounding infrastructure and personnel.
- Initial containment protocols were implemented with varying degrees of success. Further investigation into the cause of the breach is ongoing, with security detail currently at work.
- Information blackout| The Foundation has issued a temporary site lockdown order.
Designation Delta-7 : Site Ninety Six Protocol Engaged
An unknown entity has been detected within the perimeter. All personnel are to immediately evacuate and await further orders.
Subject Delta-7 is to engage {Site Ninety Six Protocol{ immediately. All assets are to be allocated as needed.
- Preserve radio silence unless absolutely necessary.
- Record all observations immediately.
- Remain vigilant at all times. This is a critical situation.
Summary of Site-96 Anomaly Findings
A comprehensive review of the anomalous events at Site-96 has been concluded. The initial findings indicate a complex and dynamic system exhibiting characteristics consistent with extradimensional activity. Additional research is necessary to elucidate the nature and intent of this anomaly.
- Key findings:
- Persistent energy fluctuations
- Spatial distortions
- Undecipherable signals
Proposed actions include increased monitoring of the Site96 site and initiation of a dedicated research team. Emergency response plans should be reassessed to reflect the evolving characteristics of this anomaly.
Site Alpha-2: Emergency Lockdown Procedure
A full lockdown has been instated within Secure Zone Alpha-2, specifically at Site 96. All personnel are to stay to designated safe areas and avoid all non-essential activities. External access to the site has been strictly prohibited. Any unauthorized persons attempting to breach the perimeter will be dealt with according to protocol.
Initial reports indicate a potential threat. The situation is being carefully assessed by security forces, and updates will be provided as they become available.
Remain calm, follow all instructions from authorized personnel, and cooperate fully with the ongoing investigation.
Investigation into Anomalous Signal Originating from Site-96
Preliminary analysis of the anomalous signal detected at Site-96 indicates a potential source originating from deep within the facility. The signal, characterized by irregular modulations in electromagnetic spectrum, has exhibited notable intensity surges at specific harmonics. Attempts are currently underway to identify the exact origin of the signal and determine its type. A squad of specialist researchers, including cryptographers, physicists, and forensic scientists, have been deployed to Site-96 to conduct a thorough investigation.
- Initial findings suggest the signal may be synthetic, though more analysis is required for verification.
- Security protocols at Site-96 have been tightened in light of the anomalous occurrence.
- Access to the site is currently restricted to authorized personnel only.